Services / 01 — Cryogenic

LNG transport:
at −162 °C, by cryogenic tanker.

We transport LNG — kept liquid at −162 °C — safely in vacuum-insulated cryogenic tankers. Under our EMRA (Energy Market Regulatory Authority) LNG Transmission Licence, we provide an end-to-end service from terminal to end user.

Figure 01 · Cryogenic tank Illustration of a cryogenic LNG tank and a snowflakeINNER TANK · VACUUM · OUTER JACKET
EMRA licenceUN 1972 · 223−162 °CClass 2

01 / Scope of service

What’s included in LNG transport?

Under our EMRA licence, we manage every link in the LNG logistics chain — from transport to terminal services — through a single point of contact.

Transport temperature
−162 °C
Licence
EMRA LNG Transmission
Equipment
Vacuum-insulated semi-trailer
Scope
Domestic · international
Request a quote

Service components

  • 01
    LNG transportScheduled shipments between terminals, filling plants and end users.
  • 02
    Terminal berthing servicesBerthing and discharge coordination in line with terminal procedures.
  • 03
    Supply servicesCrew, provisions, fuel and other supply operations.
  • 04
    Crew change & protective agency servicesManagement of crew changes and agency processes.
  • 05
    Maintenance, repair & surveyPeriodic maintenance, repair and independent survey services.

Process / The LNG journey

How does an LNG
shipment move?

From the moment a request is confirmed to the moment the report is delivered, every LNG shipment passes through five controlled steps. Each step has a named owner, a checklist and a record — and −162 °C is maintained all the way.

  1. Step 01 · Office & operations centre

    Request & planning

    Together we pin down the product, quantity, origin and destination, time window and regulatory requirements. Vehicle, ADR-certified driver, route and documents are then matched to the product class.

    • Route and risk analysis: tunnels, built-up areas, rest stops
    • Assignment of product-appropriate cryogenic equipment and driver
    • Terminal loading slot and delivery window
    Output
    Shipment plan
    Record
    Route approval
    Request and planning illustration: a checklist, a route between two points and a time window REQUEST · ROUTE · TIME WINDOW
  2. Step 02 · LNG terminal

    Loading at the terminal · −162 °C

    The cryogenic tanker berths at the LNG terminal (e.g. Marmara Ereğlisi, Aliağa) in line with site procedures. The loading arm is connected and the product is transferred at −162 °C, in the liquid phase, into the vacuum-insulated tank. The vehicle does not set off until weighing, leak-tightness and paperwork checks are complete.

    • Pre-trip vehicle and tank checklist
    • Pressure and temperature logged during loading
    • Transport documents and orange plate: 223 / UN 1972
    Product
    LNG · UN 1972
    Temperature
    −162 °C
    Terminal loading illustration: an LNG storage tank, a loading arm and a cryogenic tanker being filled at −162 °C; orange plate showing 223 / 1972 2231972 FILL TEMPERATURE−162 °C TERMINAL · LOADING ARM · CRYOGENIC TANKER
  3. Step 03 · Road · 24/7 monitoring

    On the road: pressure and temperature monitoring

    The on-board telematics unit sends position, speed and the temperature, pressure and level readings from the tank sensors to the operations centre. If a value leaves its threshold or the vehicle deviates from its route, the driver and the centre are alerted at the same time.

    • Real-time GPS position and route-deviation tracking
    • Minimal heat ingress thanks to the vacuum between the double walls
    • Designated rest stops and driver rest-time monitoring
    Monitoring
    24/7
    Data
    T · P · level · GPS
    On-road monitoring illustration: a cryogenic tanker with temperature, pressure and level sensors, a satellite link and a full-trip temperature curve TPL TEMPERATURE · FULL TRIP GPS · TEMPERATURE · PRESSURE · LEVEL · 24/7
  4. Step 04 · Delivery point

    Discharge at the delivery point

    The tanker is connected to the customer’s cryogenic storage tank with the discharge hose, and the product is transferred in line with the site instructions. Delivery is completed with a leak-tightness check and quantity measurement. On site, the LNG passes through a vaporiser and returns to gas.

    • Safety perimeter and PPE in place before discharge
    • Leak-tightness check on hoses and connections
    • Quantity measurement and delivery note
    Record
    Delivery note
    Check
    Leak-tightness
    Discharge illustration: tanker, discharge hose, vertical cryogenic storage tank and vaporiser GAS → PLANT DISCHARGE · STORAGE TANK · VAPORISER
  5. Step 05 · Close-out

    Reporting

    Each trip is closed out with a report covering temperature, pressure and route data. Our corporate customers can access shipment-level data, and these records make the next round of planning even better.

    • Shipment summary and performance data
    • Deviation and incident logs
    • Improvement notes for the next shipment
    Output
    Shipment report
    Shared
    With the customer
    Reporting illustration: a delivery report with a full-trip temperature chart, an approval stamp and transmission to the customer −162 °C · FULL TRIP CUSTOMER DELIVERY NOTE · TEMPERATURE & PRESSURE REPORT

FAQ / Frequently asked

LNG Transport: frequently asked questions.

Why is LNG transported at −162 °C?

At atmospheric pressure, natural gas liquefies at −162 °C and its volume shrinks by a factor of about 600. This makes it economical to transport to places the pipeline network doesn’t reach. Our cryogenic tankers hold this temperature throughout the journey thanks to their vacuum-insulated, double-walled construction.

What does the EMRA LNG Transmission Licence mean?

In Türkiye, transmitting LNG by road requires a licence from the Energy Market Regulatory Authority (EMRA). As a licence holder, Ventes Lojistik carries out LNG transport within the legal framework and under regulatory supervision.

Which services do you offer besides LNG haulage?

Alongside LNG transport, we provide terminal berthing services; supply services such as crew, provisions and fuel; crew changes and protective agency; and maintenance, repair and survey services.

How can I track my shipment?

Our vehicles are tracked 24/7 via GPS/telematics. Throughout the trip, our operations centre shares position, estimated arrival and delivery details with you, and corporate customers also receive shipment-level temperature and pressure reports.

Related / Other services

Related services

All our services are run from a single operations centre, with the same planning and monitoring discipline.

Quote / Planning

Whatever your product, at the right temperature.

LNG, LPG, chemicals or containers. Tell us what you need — we’ll plan the rest.