LNG Transport
LNG transport in −162 °C cryogenic tankers, plus terminal berthing services, supply, crew change, maintenance and repair, and survey services.
LNG · LPG · Chemicals — since 2012
Licensed by EMRA (Energy Market Regulatory Authority), our cryogenic tanker fleet carries LNG, LPG and ADR chemicals — from terminal to your facility, monitored 24/7.

01 / Nationwide route network
Loading at the Marmara Ereğlisi, Aliağa and Dörtyol LNG terminals; delivery to industrial plants, city supply points and distribution hubs. Every route is planned in advance and every shipment is tracked live, 24/7.
Stops and distances are illustrative (approximate road distances). The actual route network is to be confirmed with the company before launch.

Figures carried over from the current website; to be updated before launch.
03 / Phase change
Cooled to −162 °C, natural gas turns liquid and shrinks to roughly 1/600th of its volume — the edge of the cube becomes 8.4 times shorter. A single cryogenic tanker can then safely carry a large amount of energy to any point the pipeline network doesn’t reach.
Use the slider to cool the gas: first the molecules slow down and the volume shrinks; at −162 °C, condensation begins.
04 / Tank technology
This cross-section is taken through the middle of the cryogenic trailer tank. What keeps LNG liquid throughout the journey is three nested layers — and the vacuum between them.
05 / The LNG journey
Loading at the terminal, 24/7 monitoring on the road, delivery at your facility. The animation below follows one shipment from start to finish — then explore each step in detail.
From the moment a request is confirmed to the moment the report is delivered, every LNG shipment passes through five controlled steps. Each step has a named owner, a checklist and a record — and −162 °C is maintained all the way.
Step 01 · Office & operations centre
Together we pin down the product, quantity, origin and destination, time window and regulatory requirements. Vehicle, ADR-certified driver, route and documents are then matched to the product class.
Step 02 · LNG terminal
The cryogenic tanker berths at the LNG terminal (e.g. Marmara Ereğlisi, Aliağa) in line with site procedures. The loading arm is connected and the product is transferred at −162 °C, in the liquid phase, into the vacuum-insulated tank. The vehicle does not set off until weighing, leak-tightness and paperwork checks are complete.
Step 03 · Road · 24/7 monitoring
The on-board telematics unit sends position, speed and the temperature, pressure and level readings from the tank sensors to the operations centre. If a value leaves its threshold or the vehicle deviates from its route, the driver and the centre are alerted at the same time.
Step 04 · Delivery point
The tanker is connected to the customer’s cryogenic storage tank with the discharge hose, and the product is transferred in line with the site instructions. Delivery is completed with a leak-tightness check and quantity measurement. On site, the LNG passes through a vaporiser and returns to gas.
Step 05 · Close-out
Each trip is closed out with a report covering temperature, pressure and route data. Our corporate customers can access shipment-level data, and these records make the next round of planning even better.
06 / Services
Years of experience in LNG and LPG transport and distribution across Türkiye — combining our fleet, experienced team and technology to deliver solutions that add real value for our customers.
LNG transport in −162 °C cryogenic tankers, plus terminal berthing services, supply, crew change, maintenance and repair, and survey services.
We manage the whole process from filling to dispatch, delivering safely in a range of capacities.
Port-to-address, door-to-door transit haulage, customs clearance included.
07 / Technology
Our fleet is tracked in real time via GPS/telematics, and pressure and temperature in the cryogenic tanks are monitored continuously. Our operations centre, our drivers and our customers all see the same data.
Panel values are illustrative and simulated for demo purposes.
08 / Our journey
A story that began with storage and containers has grown into a cold chain spanning dangerous goods, LNG/LPG and chemical transport — adding new capabilities at every step.
Our first step into logistics.
Moving into dangerous goods transport.
Core focus: transport and distribution.
LNG Transmission Licence.
A fleet equipped to international standards.
09 / Latest
Updates from our fleet, our projects and the industry.
All newsWe have started transporting chemicals with a fleet equipped to international standards, bringing the same rigour to ADR-regulated products.
Read the chemical transport announcementKeep an eye on our openings for ADR-certified drivers and operations specialists.
Get in touch to applyQuote / Contact
Share your route, product and capacity details — our operations team will get back to you the same day.